Floor-plan audit and design corrections

19 September 2026 · Single-story ADUs up to 1,000 SF

This is a dimensional and layout screening audit, not an IRC compliance certificate. The site, adopted code edition, actual door/window products, structural assemblies and building services are not specified. A passing screen cannot establish that a home is permit-ready or fully functional in every respect.

What was examined

Reviewed the layout generator, bathroom and furniture placement, wall/opening data, facade modifiers, entry logic and coordinated drawings. Tested 1,508 distinct normalized configurations across six reference presets plus the simple facade, both room programs, mirrored plans, footprint/bedroom-depth boundaries, roof forms, ridge directions, glazing types and overrides, glazing-size limits, fireplaces and raised decks. This is boundary and interaction coverage, not an exhaustive enumeration of continuously variable settings. The dimensional review also runs whenever a new geometric layout is generated.

1,506 configurations generated; 2 were rejected because a clear kitchen run could not fit. The accepted set contained zero failures of the implemented dimensional screens. 820 retained planning notes: laundry omitted in 712, short preparation counter in 364, limited bed access in 40, dining omitted in 7. Categories overlap. These are unresolved design tradeoffs, not automatically code violations.

Corrections made

Starting presets after corrections

PresetAreaScreen failuresPlanning notesProject review
Woodland Glass864 SF00Required
Charred + Cedar760 SF00Required
Coastal Retreat912 SF00Required
White Gable560 SF00Required
Forest Fireplace672 SF00Required
Oak + White640 SF00Required

Zero recorded issues means only that these presets satisfy the implemented screens. It does not verify every circulation route, appliance operation, product clearance or code provision.

Screening basis and limits

TopicBaseline usedWhat remains
Bedrooms and hallsBedroom area 70 SF, minimum dimension 7 feet; hallway screen 36 inches. IRC R304 / R311.6.Finished assemblies, room shape, furniture access and continuous circulation.
HeadroomNominal clear ceiling at least 7 feet; controls already start at 8 feet. IRC R305.Beams, services, finishes and local exceptions.
Bathrooms15-inch centerline side spacing, 21-inch fixture front space; 24-inch shower approach and nominal 36-inch shower. IRC P2705 / P2708.Finished shower interior, door opening, controls, product dimensions, actual door swings and accessibility.
Bedroom escapeOperable candidate and sill/nominal size screen. IRC R310.Net clear width/height/area, operating hardware, outside rescue access and qualifying grade-floor conditions. A nominal window envelope is not usable opening area.
Primary entry36 × 80-inch nominal leaf retained. IRC R311 review.32-inch clear width, 78-inch clear height, thresholds, landings, hardware and a route to the public way.
Kitchen and diningNKBA planning targets, distinct from code minima.Appliance models and doors, landing areas, work aisle intersections, ventilation, electrical and heat clearances.

The kitchen targets are drawn from the NKBA Kitchen Planning Guidelines: 42 inches for one cook, 48 for multiple cooks, a 36-inch preparation surface beside the sink, and 32 inches behind seating where traffic does not pass. A route behind seated people needs additional space. These are recommendations, not a claim that IRC mandates each dimension.

Required before design approval

  1. Confirm city/county, adopted IRC edition and amendments, ADU zoning, setbacks, lot coverage, height, utility service and accessibility/visitability requirements.
  2. Check continuous circulation, privacy, bedroom/wardrobe access, every door/appliance swing and a usable route from each occupied area to the required exit. The current collision checks do not prove these routes.
  3. Select actual windows and doors. Confirm bedroom escape net-clear dimensions, safety glazing, thresholds, hardware, landings and exterior rescue routes.
  4. Resolve daylight and natural ventilation or compliant mechanical alternatives; bathrooms/kitchen exhaust; smoke and CO alarms; hot water, plumbing, heating/cooling and equipment/service space.
  5. Complete structural, energy, fire-separation, moisture and site-specific design. CFS member sizes, connections, bracing, headers and fabrication data are outside this audit.

References and reproducibility

Model-code baseline: 2021 IRC, building planning and plumbing fixtures. Direct ICC text access was restricted during this audit; verify the adopted edition with the project professional. Supporting public references include Seattle’s R304.1 room-area guidance and the ICC-published Florida P2705.1 fixture provision; these do not establish the code applicable to this project.

The additional 576-case interior collision suite, deliberate-failure audit checks, 24 geometry/program/mirror checks, six generated PDF sets and performance regressions passed. Selected PDF floor-plan, opening-schedule and review pages were visually inspected. No browser or on-device walkthrough review was performed.